Southend-on-Sea’s Fourth Local Transport Plan (LTP4) 2027 to 2045
Have Your Say
We’re developing a new Local Transport Plan (LTP4) that will shape the future of transport in Southend-on-Sea from 2027 to 2045.
The plan will set out our long-term vision for how people move around the city and how transport can support residents, workers and visitors. As the local transport authority, Southend-on-Sea City Council is required to prepare a Local Transport Plan, setting out its transport priorities and how they contribute to national transport objectives.
What should transport in Southend deliver?
We want a transport network that:
- Helps people get around easily and reliably
- Provides better bus and rail services
- Makes walking, wheeling and cycling safer and more attractive
- Is accessible and easy to use for everyone
- Manages traffic congestion
- Improves road safety
- Improves air quality and reduces carbon emissions
- Supports local businesses, jobs and economic growth
- Keeps roads and transport infrastructure in good condition
- Supports new travel options and transport improvements
- Secures funding from developers to help deliver transport projects
We want to hear your views before the plan is finalised.
The Council commissioned steer, an independent transport consultancy, to work alongside officers in developing the Fourth Local Transport Plan (LTP4). Steer helped gather and analyse evidence and engage with stakeholders, ensuring the Plan is based on sound technical expertise, reflects local needs and priorities, and aligns with national and regional transport policies and best practice.
Next Steps
Following consultation, all comments received will be reviewed and considered before the Local Transport Plan is finalised and adopted.
A consultation report summarising feedback and responses will be published after the consultation closes.
Consultation Documents
The Fourth Local Transport Plan (LTP4) sets out Southend-on-Sea’s long-term transport plans to 2045. It consists of two main documents: the Strategy, which outlines the overall transport policy direction, and the Implementation Plan, which sets out the actions needed to deliver the plan. An accessible Summary document has been produced to explain both documents.
- Draft Fourth Local Transport Plan (LTP4) Summary Document
- Draft LTP4 Strategy
- Draft LTP4 Implementation Plan
- Draft LTP4 Evidence Base
- Draft LTP4 Carbon Report
- Draft LTP4 Equalities Impact Assessment (EqIA)
- Draft LTP4 Health Impact Assessment (HIA)
- Draft LTP4 Strategic Environmental Assessment (SEA)
Consultation is now open for 8 weeks closing on 17th November 2026.
Consultation on LTP 4
To take part in this consultation, you will need to register. Registration helps us ensure that responses are genuine, prevents duplicate submissions, and allows us to meet our legal obligations when carrying out a statutory consultation. Local Transport Plan consultations are a requirement under UK transport legislation, and collecting registration details helps us maintain a transparent and robust consultation process while ensuring that all feedback is recorded and considered appropriately.
Please remember that the LTP4 is a high-level strategic plan and not a detailed design for individual transport schemes. More detailed proposals will be developed and consulted on separately in the future. When answering the following questions, please focus on the overall missions, objectives, policies and actions proposed within the LTP4, and whether you feel they support Southend-on-Sea’s future transport needs through to 2045.
Consultation closes at 5pm on 17th November 2026
Only registered users can take part in this survey
Published: 24th September 2026
News & Events
9 November 2026
Receive 75% off your Cyber Essentials assessment
6 November 2026
More Switch On Details Revealed as New Sponsors Announced
27 October 2026
